COCORP Montana 12
|
| Start Date | 10/1/92 |
End Date | 10/10/92 |
Date of Startup | 10/1/92 |
|
| Contractor | Reliable Exploration Inc. |
Crew Number | |
|
|---|
|
COCORP Honcho | Jim Knapp |
Startup Supervisor | Jim Knapp |
Surface Coverage | 88.75 km |
PARAMETERS
|
| Recording System | 5 - DFS V |
No. of Channels | 480 or 600 |
Geophone Group Spacing | 50 |
Source Spacing | ~3 km |
Source/Nearest Receiver Offset | 0 |
| Push/Pull | This Line was shot through the spread |
Offend of Split | Split |
Noise Reject | No |
Vibrator Power | |
Stacking Fold | |
| Sampling Interval | 4 ms |
Antialias Filter | 64 hz |
Sweep Freq. Start | N/A |
Sweep Freq. End | N/A |
Sweep Duration | N/A |
| Total Record Time | 60 sec |
Correlated Record Length | 60 sec |
Upsweep or Downsweep | N/A |
Number of Sweeps per VP | N/A |
Notch Filter | 60 |
Geophone Array
|
| Geophone Type | L21A |
Natural Frequency of Geophone | 10 hz |
Number of Geophones per Station | 9 |
|
|---|
| Spacing Between Geophone Elements | |
Weighting Scheme | |
Total Geophone Array Length | Linear |
|---|
Source Array
|
| Vibrator Type | Dynamite |
Primary Array| No. of Vibrators | |
| Spacing Between Vibrators | m |
| Source Moveup Between Sweeps | m |
|---|
| 1st Vibrator starts (relative to the flag) | m |
| Array Source Array Length | m |
|---|
Backup Array| No. of Vibrators | |
| Spacing Between Vibrators | m |
| Source Moveup Between Sweeps | m |
|---|
| 1st Vibrator starts (relative to the flag) | m |
| Array Source Array Length | m |
|---|
|
|---|
|
|---|