COCORP OHIO 1

Start Date 8/21/87 End Date 10/19/87 Date of Startup ?/?/?
Contractor SSC Crew Number VH
COCORP Honcho TOM PRATT
Startup Supervisor No One Surface Coverage 277.6km


PARAMETERS

Recording System DFSV No. of Channels 120 Geophone Group Spacing 100.6m Source Spacing 100.6m Source/Nearest Receiver Offset 4stations
Push/Pull PUSH Offend of Split SPLIT Noise Reject YES Vibrator Power 50&100% Stacking Fold 60
Sampling Interval 4 Antialias Filter 45hz Sweep Freq. Start 10hz Sweep Freq. End 45hz Sweep Duration 28seconds
Total Record Time 43seconds Correlated Record Length 15seconds Upsweep or Downsweep UP Number of Sweeps per VP 16 Notch Filter 60hz


Geophone Array

Geophone Type 20-D Natural Frequency of Geophone 8hz Number of Geophones per Station 24
Spacing Between Geophone Elements 4.3m Weighting Scheme llllllllllllllllllllllll Total Geophone Array Length 98.1


Source Array

Vibrator Type 5_FAILING_Y2400'S
Primary Array
No. of Vibrators5 Spacing Between Vibrators 9.2 m Source Moveup Between Sweeps 6.3 m
1st Vibrator starts (relative to the flag) -28.8 m Array Source Array Length 216.5 m
Backup Array
No. of Vibrators 4 Spacing Between Vibrators 9.1 m Source Moveup Between Sweeps 6.3 m
1st Vibrator starts (relative to the flag) -33.5 m Array Source Array Length 121.9 m